Project Experience

Scope of Work:

Civil & Structural Engineering Design

  1. Pile foundation design

  2. RC (reinforced concrete) structure design

  3. Steel structure design

  4. Equipment foundation design

  5. Plot plan design

  6. Design of equipment grounding network and lightning protection system

  7. Planning of dikes and drainage systems

  8. Preparation of all related design drawings

Process & Equipment Engineering

  1. Equipment layout (Plot Plan) design: provide 3D model drawings for owner review and assist in building SSPID.

  2. Design, fabrication, and installation according to equipment datasheets.

Piping Engineering

  1. Piping layout drawings

  2. Piping isometric drawings

  3. Pipe support drawings and piping material lists

  4. Piping stress analysis

Permit Applications

  • Civil design approval (including professional engineer certification)

  • Miscellaneous permit applications

  • Building permit applications and fire protection design approval

  • Class C facility approval

Civil & Mechanical Construction Works

  1. Geological drilling required for civil design

  2. Land excavation and disposal of soil and waste

  3. Removal and relocation of existing underground pipelines, if applicable

  4. Civil pile foundation trial assembly/construction, and redesign and construction of dikes and drainage systems

  5. Equipment fabrication and installation positioning, fabrication and installation of equipment platforms and ladders

  6. Equipment washing and pressure testing

  7. Pressure vessel applications and inspection of hazardous machinery and equipment

  8. Installation of OSBL, ISBL, and fire protection piping, including pipe racks and supports, RT inspection, water flushing or steam blowing, and pressure testing

Instrumentation & Electrical Equipment (Control Valves, Safety Valves, Level Gauges, etc.)

  • Mechanical installation and instrument air piping according to owner-provided design data

  • Disassembly and reinstallation of instruments, and fabrication of temporary spool pieces during equipment pressurization and cleaning

Rotating Equipment

  • Installation and alignment according to owner-provided design data